Ferry Karsibór II
Works on the Karsibór II ferry began with a full survey of the existing electrical installation. This meant disconnecting and reconnecting several hundred points proceeded without risk of error, and the engine room systems could be commissioned during sea trials
- Cabling
- over 10 km
- Devices
- 150
- Connection points
- over 500
Scope of works
- Survey of the existing electrical installation
- Connection and commissioning of 150 devices
- Laying of over 10 km of cabling
- Survey, disconnection and reconnection of over 500 connection points
- Commissioning of engine room systems during sea trials