Ferry Karsibór II — Świnoujście, Poland
Marine electrical installations

Świnoujście, Poland

Ferry Karsibór II

Works on the Karsibór II ferry began with a full survey of the existing electrical installation. This meant disconnecting and reconnecting several hundred points proceeded without risk of error, and the engine room systems could be commissioned during sea trials

Cabling
over 10 km
Devices
150
Connection points
over 500

Scope of works

  • Survey of the existing electrical installation
  • Connection and commissioning of 150 devices
  • Laying of over 10 km of cabling
  • Survey, disconnection and reconnection of over 500 connection points
  • Commissioning of engine room systems during sea trials