Four vessels
Alfa Laval PureSOx Scrubber
Installing the Alfa Laval PureSOx exhaust gas scrubbers is one of the largest installation projects in the company's history. We installed the system on four vessels, carrying out commissioning together with the manufacturer's service team
- Vessels
- 4
- Cabling
- over 64 km
- Connected devices
- over 800
- Roxtec transits
- 80
Scope of works
- Installation of the system on four vessels
- Laying of over 64 km of cabling
- Connection of over 800 devices
- Installation of 80 Roxtec cable transits
- Cable cross-sections from 1 × 2 × 0.75 mm² to 3 × 185 mm²
- System commissioning together with the manufacturer's service team
The scrubber installation combines high-current routes of large cross-section with a dense network of measurement and control circuits — we ran both layers in parallel, ensuring separation and immunity to interference
We carried out commissioning together with the Alfa Laval service team, which allowed the functional tests to be completed and the system handed over to the owner without extending the shipyard stay