“Karsibór II” ferry

  • Making documentation for the old, existing electrical installation
  • Connection and commissioning of over 150 devices
  • Over 10 km of cables
  • Drawing, disconnecting and reconnecting over 500 connection points
  • Commisioning of engine room systems during sea trials